Siemens SGT5-2000E Heavy-Duty Gas Turbine Generator Set

The Siemens SGT5-2000E is a proven heavy-duty gas turbine for 50 Hz power markets, suitable for simple cycle, combined cycle, and CHP applications. With strong reliability, fuel flexibility, and fast-start capability, it is well suited for utility power generation, industrial self-generation, and peak-load support.

Under ISO conditions, the SGT5-2000E delivers approximately 198 MW in simple cycle with 37.6% efficiency. In combined cycle configuration, the SCC5-2000E can achieve 275 MW in a 1×1 arrangement and 551 MW in a 2×1 arrangement, with overall efficiency up to 53.3%.

A brand-new Siemens SGT5-2000E unit is available for project discussion. Please contact us for technical details, supply scope, and commercial information.

Additional information

Manufacturer

Siemens Energy

Model

SGT5-2000E

Condition

Brand New

Turbine Type

Heavy-Duty Gas Turbine Generator Set

Simple Cycle Output

198 MW

Simple Cycle Efficiency

37.6%

Turbine Stages

4-Stage Turbine

Supply Basis

Subject to Final Technical Review

Scope of Supply

1. Gas Turbine Core Unit

  • Siemens SGT5-2000E heavy-duty gas turbine core unit
  • Horizontally split casing design
  • 16-stage axial compressor
  • 4-stage turbine section
  • Twin combustor arrangement

2. Package and System Basis

  • Gas turbine package prepared for large-scale power generation applications
  • Suitable for simple cycle, combined cycle, or CHP project discussion
  • Modular design concept for easier project integration
  • Final package scope to be confirmed according to project requirement

3. Fuel and Operating Capability

  • Suitable for gaseous and liquid fuels
  • Applicable to natural gas and selected liquid fuel projects
  • Fuel flexibility and operating basis can be reviewed during technical discussion
  • Configuration can be evaluated according to plant and site conditions

4. Technical and Commercial Scope

  • Technical review available before order confirmation
  • Supply scope and interface details to be clarified according to actual project requirement
  • Documentation and project discussion available for serious buyers

Inspection, Testing & Technical Review

  • Technical review can be arranged based on actual project requirements
  • Configuration discussion is available for simple cycle, combined cycle, or CHP applications
  • Fuel selection, site conditions, and project matching can be reviewed before commercial confirmation
  • Delivery scope, system interfaces, and technical details can be clarified during project discussion

Project Support Services

  • Technical communication based on output, fuel type, and plant requirements
  • Preliminary solution discussion for utility and industrial power generation projects
  • Documentation support for technical evaluation and internal review
  • Commercial discussion for supply scope, delivery basis, and project schedule
  • Direct inquiry support for overseas buyers seeking large gas turbine solutions

Frequently Asked Questions

What applications is the Siemens SGT5-2000E suitable for?
The Siemens SGT5-2000E is suitable for simple cycle power generation, combined cycle power plants, and CHP projects. It is a strong choice for utility power generation, industrial self-generation, and peak-load support in 50 Hz markets.
In combined cycle applications, the SCC5-2000E configuration can achieve approximately 275 MW in a 1×1 arrangement and 551 MW in a 2×1 arrangement, with overall efficiency up to 53.3%.
Yes. The final package scope, technical configuration, and project matching can be discussed according to the actual project requirement before commercial confirmation.

Request a Quote & Technical Matching

Please provide your contact details and project requirements below. Our team will review your request and recommend suitable equipment solutions based on your application, technical needs, and delivery destination.
Site inspection, pre-shipment checking, and project discussion can be arranged for serious buyers.

No content is added yet.