This Siemens SGT-400 gas turbine generator set is a low-hour industrial power generation unit manufactured in 2019. The unit has only 243 running hours and 33 starts, making it a strong option for buyers looking for a cost-effective gas turbine package with short availability compared with ordering a new unit.
The package is rated at 14.3 MW electrical output, 50Hz frequency, and is designed for dual-fuel operation with natural gas and liquid fuel. It is suitable for industrial power plants, captive power projects, oil & gas facilities, steel plants, chemical plants, and distributed power generation projects.
| Brand / Model | Siemens SGT-400 |
|---|---|
| Manufacture Year | 2019 |
| Running Hours | 243 hours |
| Electrical Output | 14.3 MW(e) |
| Frequency | 50Hz |
| Fuel | Natural gas / liquid fuel, dual-fuel system |
| Generator Voltage | 10.5kV |
| Supply Basis | Subject to Final Technical Review |
The available package may include the following main systems and auxiliary equipment:
This Siemens SGT-400 gas turbine generator set is a low-running-hour unit manufactured in 2019, with only 243 operating hours and 33 starts.
Before shipment, the unit can be inspected on site. Available inspection items may include visual inspection, nameplate verification, package configuration check, control system record review, running hour verification, auxiliary system inspection, and technical document review.
According to the buyer’s project requirements, we can also support further technical checking, cleaning, preservation, dismantling preparation, packing inspection, and third-party inspection arrangement before shipment.
Main inspection and preparation scope may include:
– Verification of turbine model, generator data, running hours and starts
– Review of available control system records and operation data
– Visual inspection of gas turbine package and auxiliary systems
– Checking of air intake, exhaust, fuel, lube oil, cooling and sealing air systems
– Generator and electrical system condition review
– Confirmation of major package components and supply scope
– Pre-shipment cleaning and preservation if required
– Optional third-party inspection by SGS, BV, or other inspection agencies
– Photo and video documentation before shipment
Final inspection scope can be discussed according to the buyer’s technical requirements and project schedule.
Please provide your contact details and project requirements below. Our team will review your request and recommend suitable equipment solutions based on your application, technical needs, and delivery destination.
Site inspection, pre-shipment checking, and project discussion can be arranged for serious buyers.
Chanba Road, Chanba Ecological District, Xi'an, Shaanxi, China
Copyright 2026, Fangix. All Rights Reserved.